- Home Page /
- Industrial Supplies /
- Industrial Electrical /
- Optoelectronic Products /
- LED Equipment /
- Surface Emitting LEDs /
- 5mm 6 Colors x 20pcs (120pcs) Assorted Colors...
5mm 6 Colors x 20pcs (120pcs) Assorted Colors Lights LED Diodes (Colored Lens) Diffused Round Lens 29mm Long Lead +200pcs Resistors (for DC 6-12V)
LAK 294907
Price Details
Excluding Shipping & Custom charges ( Shipping and custom charges will be calculated on checkout )
*All items will import from US
QTY:
Ubuy works hard to protect your security and privacy. Our advanced payment security system ensures confidentiality by encrypting your information during transmission using AES (Advanced Encryption Standards) and SSL (Secure Socket Layer) protocols. Your payment details are 100% secure as we do not share your payment details with third party sellers.
Fast
Shipping
Free
Return*
Secure Packaging
100% Original Products
PCI DSS Compliance
ISO 27001 Certified
What Stands Out
Product Details
| Light Type | LED |
| Additional Features | Instant On |
| Bulb Shape Size | F20 |
| Bulb Base | E26 Medium |
| Incandescent Equivalent Wattage | 50 Watts |
| Specific Uses For Product | General purpose |
| Light Color | white, blue |
| Voltage | 3 Volts |
| Indoor Outdoor Usage | Indoor |
| Power Source | DC Power Supply |
| Color Rendering Index | 95 |
| Beam Angle | 120 Degrees |
| Power Consumption | 0.06 Watts |
| Light Source Type | LED |
| Light Source Wattage | 0.06 Watts |
| Accepted Voltage Frequency | 100 to 240 Volts and 50 Hertz to 60 Hertz |
| Control Method | Touch |
| Light Source Operating Life | 50000 Hours |
| White Brightness | 50 Lumens |
| Light Output Maximum | 50 Lumens |
| Controller Type | Push Button |
| Connectivity Technology | Normal bulb |
| Brand Name | EDGELEC |
| Number of Items | 120 |
| Manufacturer | EDGELEC |
| UPC | 611355169030 |
| Manufacturer Part Number | ED_TC_YW05_6S/20Pcs |
| Included Components | 120 pcs LED Diodes, 200 pcs Resistors, 200 pcs Metal Film Resistors |
| Unit Count | 120 Count |
| Package Quantity | 120 |
| Item Weight | 290 Milligrams |
| Item Dimensions W x H | 0.2"W x 1.14"H (0.5 cm) |
| Material Type | Metal |
| Shape | 5mm Round Top |
| Style Name | 5mm Constant Light |
| Color | [01] 6 Color X 20pcs / 120pcs |
| Brand | EDGELEC |
| Special Feature | Instant On |
Who Should Buy?
-
Hobby Electronics
Ideal for amateur electronics enthusiasts who enjoy DIY projects involving lighting effects and circuits.
-
Educational Purposes
Perfect for educators and students to demonstrate basic electronic principles through hands-on experiments with LEDs.
-
Decorative Lighting
Useful for crafters looking to add blinking light effects to decorations for events or home decor.
-
Professional Installations
Not suitable for commercial use or professional applications where high reliability and consistent lighting are required.
Product Description
5mm 6 Colors x 20pcs (120pcs) Assorted Colors Lights LED Diodes (Colored Lens) Diffused Round Lens 29mm Long Lead +200pcs Resistors (for DC 6-12V) Included,Bulb Lamps Light Emitting Diode
Customer Questions & Answers
-
Question: How to Shop 5mm 6 Colors x 20pcs (120pcs) Assorted Colors Lights Online From Ubuy?
Answer: It’s easy to shop 5mm 6 Colors x 20pcs (120pcs) Assorted Colors Lights online from Ubuy. You just have to search for the product, choose your shipping method while checking out and get it delivered to your location. -
Question: Is 5mm 6 Colors x 20pcs (120pcs) Assorted Colors Lights Available to Shop Online in Laos?
Answer: Yes, at Ubuy Laos this product is available for you to shop at a reasonable price. The 5mm 6 Colors x 20pcs (120pcs) Assorted Colors Lights is not available locally but you can trust us with our express shipping services. -
Question: How Long Does It Take to Get Product After Placing the Order?
Answer: The delivery time of your ordered product varies as per what you've ordered and the shipping method that you've chosen. The estimated delivery time is mentioned during the checkout process, so be carefree while shopping.
EDGELEC Surface Emitting LEDs Editorial Review
The EDGELEC 100pcs 5mm RGB Tri-Color Red Green Blue Multicolor 4Pin LED Diodes Common Cathode comes with 300pcs resistors for DC 6-12V Included. The reviewers praised the product for being of decent quality and value, with a good range of colours. They also recommend using Ohm's law to calculate the appropriate resistor for the intended voltage. Customers note that the longest pin is the common anode and the shortest pin is the ground. A reviewer advises that if you want different colours as a fourth option, you would need to use an RGBW LED that requires five leads. Some customers complained that the LEDs were dimmer than expected and did not blink after wiring them, with some reviewers suggesting checking the voltage or looking at the diode's maximum current capacity.
Customer Reviews & Ratings
-
5 Star
0%
-
4 Star
100%
-
3 Star
0%
-
2 Star
0%
-
1 Star
0%
Review this product
Share your thoughts with other customers
Pros
- Good range of colours
- Comes with 300 resistor pieces
- Decent quality and value
Cons
- LEDs may be dimmer than expected
Platform Trust & Buyer Confidence
“Excellent quality and original too,when ubuy send original things I will appreciate that ,I very satisfied thank you”
“The order and delivery progress was communicated very well. Package arrived within the estimated time. Products arrived as expected in good condition.”
“Good supply of products. Safe payment methods, and shipment worldwide! Genuine products.”
“Was my first time buying a product from Ubuy, but I found it so helpful. This is reliable. Gonna place a new order!”
“Ubuy is a great online platform to buy stuff. Reliable, fast delivery time and great value for money. I've been using Ubuy online shopping platform for three years now and will continue to do so.”
Product Price History
Important information
- Limitations : For products shipped internationally, please note that any manufacturer warranty may not be valid; manufacturer service options may not be available; product manuals, instructions, and safety warnings may not be in destination country languages; the products (and accompanying materials) may not be designed in accordance with destination country standards, specifications, and labeling requirements; and the products may not conform to destination country voltage and other electrical standards (requiring use of an adapter or converter if appropriate). The recipient is responsible for assuring that the product can be lawfully imported to the destination country. When ordering from Ubuy or its affiliates, the recipient is the importer of record and must comply with all laws and regulations of the destination country.
- Not all the products listed on Ubuy are for sale, as Ubuy is a global search engine. Products are subject to export/trade regulations.
LAK 294907
Order now and get it around Monday, August 24
This item is not restrict in my country.(Please click on above link if this item is not restrict in your country, So our team will review and allow.)
QTY:
PCI DSS compliant and ISO 27001:2022 certified, with encrypted payments and full buyer protection on every order.
Ubuy Assurance
Experience worry-free shopping with 100% original products, PCI DSS-compliant payment security, ISO 27001-certified data protection, the fastest cross-border delivery, free returns *, and secure packaging on every order.