0 ratings
Keepro Hybrid Air Hose, Flexible 1/4 Inch ID By 10 Feet Long Lead-in Short Air Compressor Hose with Swivel Solid Brass 1/4" Industrial Quick Coupler and Plug, 300 PSI Maximum Pressure, Red
Item #: 263757702

Keepro Hybrid Air Hose, Flexible 1/4 Inch ID By 10 Feet Long Lead-in Short Air Compressor Hose with Swivel Solid Brass 1/4" Industrial Quick Coupler

Item #: 263757702

LAK 560867

Price Details

Excluding Shipping & Custom charges ( Shipping and custom charges will be calculated on checkout )

*All items will import from US

0 ratings Write a review
In stock
us Imported from USA store

QTY:

Order now and get it around Wednesday, October 21
Our Top Logistics Partners
  • fedex
  • dhl
U-Care Warranty:
None
Select a Plan
fast shipping

Fast
Shipping

free return

Free
Return*

secure packaging

Secure Packaging

100% original products

100% Original Products

pci-dss

PCI DSS Compliance

iso certified

ISO 27001 Certified


paypal payment
visa payment
mastercard payment
Note: Step Down Voltage Transformer required for using electronics products of US store (110-120). Recommended power converters Buy Now.

Product Details

Shop Keepro Hybrid Air Hose, Flexible 1/4 Inch ID By 10 Feet Long Lead-in Short Air Compressor Hose with Swivel Solid Brass 1/4 Industrial Quick Coupler and Plug, 300 PSI Maximum Pressure, Red online at a best price in Laos. B0F24G2MK5
Item Dimensions L x W10"L x 0.75"W (25.4 x 1.9 cm)
Nominal Wall Thickness0.375 inches
Outside Diameter0.75 inches
Item Length10 inches (25.4 cm)
Material TypeBrass, Hybrid Rubber and PVC
ColorRed
Maximum Pressure300 psi
Brand NameKeepro
ManufacturerKeepro
Unit Count1 Feet
Included ComponentsAir Hose, Brass Fittings
BrandKeepro
MaterialBrass, Hybrid Rubber and PVC
Product Dimensions (L x W x H)10"L x 0.75"W (25.4 x 1.9 cm)
Number of Packs1

Product Description

Keepro Hybrid Air Hose, Flexible 1/4 Inch ID By 10 Feet Long Lead-in Short Air Compressor Hose with Swivel Solid Brass 1/4" Industrial Quick Coupler and Plug, 300 PSI Maximum Pressure, Red

Have any Query? Chat with us

Customer Questions & Answers

  • Question: How to Shop Keepro Hybrid Air Hose, Flexible 1/4 Inch ID By 10 Online From Ubuy?

    Answer: It’s easy to shop Keepro Hybrid Air Hose, Flexible 1/4 Inch ID By 10 online from Ubuy. You just have to search for the product, choose your shipping method while checking out and get it delivered to your location.
  • Question: Is Keepro Hybrid Air Hose, Flexible 1/4 Inch ID By 10 Available to Shop Online in Laos?

    Answer: Yes, at Ubuy Laos this product is available for you to shop at a reasonable price. The Keepro Hybrid Air Hose, Flexible 1/4 Inch ID By 10 is not available locally but you can trust us with our express shipping services.
  • Question: How Long Does It Take to Get Product After Placing the Order?

    Answer: The delivery time of your ordered product varies as per what you've ordered and the shipping method that you've chosen. The estimated delivery time is mentioned during the checkout process, so be carefree while shopping.

Keepro Hoses Editorial Review

No editorial reviews found

Customer Reviews & Ratings

5.0
1 customers ratings
  • 5 Star
    100%
  • 4 Star
    0%
  • 3 Star
    0%
  • 2 Star
    0%
  • 1 Star
    0%

Review this product

Share your thoughts with other customers

Product Price History

Important information

  • Limitations : For products shipped internationally, please note that any manufacturer warranty may not be valid; manufacturer service options may not be available; product manuals, instructions, and safety warnings may not be in destination country languages; the products (and accompanying materials) may not be designed in accordance with destination country standards, specifications, and labeling requirements; and the products may not conform to destination country voltage and other electrical standards (requiring use of an adapter or converter if appropriate). The recipient is responsible for assuring that the product can be lawfully imported to the destination country. When ordering from Ubuy or its affiliates, the recipient is the importer of record and must comply with all laws and regulations of the destination country.
  • Not all the products listed on Ubuy are for sale, as Ubuy is a global search engine. Products are subject to export/trade regulations.